Cairns Regional Council SPS H Replacement

//Cairns Regional Council SPS H Replacement
Cairns Regional Council SPS H Replacement 2017-02-06T11:09:25+10:00

CAIRNS REGIONAL COUNCIL SPS H REPLACEMENT

RPEQ certified 3.0m x 6.740m deep Wet Well / Valve Pit Combo with 2 x 150mm discharge Flygt Pumps and 375mm inlet.

Mullaly FRP Packaged Pump Stations are an approved product with Cairns Regional Council.
Mullaly has been specified as the provider of the FRP Packaged Pump Stations for the Cairns Regional Council SPS upgrade program.

SPS H was a concrete pump station requiring replacement due to deterioration (concrete pump stations do not have the same length of life and require greater maintenance than FRP/Fibreglass stations).  SPS H is situated in a carpark on The Esplanade in Cairns.

The replacement had to minimise impact to motorists and people using the Esplanade and associated parkland.

Using a Mullaly FRP Packaged Pump Stations meant Cairns Council could be confident:
• it would be installed with minimal impact on motorists and pedestrians due to its short installation period;
• of the quality of the new station knowing it has a 50year warranty and a minimum design life of 100 years;
• it will be low maintenance

GALLERY