MIP4 Warraber Island Torres Straits Queensland

//MIP4 Warraber Island Torres Straits Queensland
MIP4 Warraber Island Torres Straits Queensland 2017-02-06T14:25:59+11:00

MIP4 WARRABER ISLAND TORRES STRAITS QUEENSLAND

One RPEQ certified 2.0m diameter FRP Pump Station Combo Pump Station and two RPEQ certified 2.0m diameter FRP lift stations.

Warraber Island Torres Straits needed to upgrade its waste water management system.

To resolve this Mullaly was contracted to manufacture:
• One 2.0m Diameter x 7.31m deep FRP Wet Well/Valve Pit Combo Packaged Pump Station including DWV Inlet Couplings, 1Poly Pipe & E/F Weld fittings, FBE coated Valves, Aluminium Hatch Covers, and S.S. guide rails
• One 2.0m Diameter x 7.08m deep FRP Wet Well/Discharge Pit with DWV Inlet Couplings, Poly Pipe & E/F Weld fittings, FBE coated Valves, Alum Hatch Covers, and S.S. guide rails
• One 2.0m Diameter x 6.53m deep FRP Wet Well/Discharge Pit DWV Inlet Couplings, Poly Pipe & E/F Weld fittings, FBE coated Valves, Alum Hatch Covers, and S.S. guide rails

GALLERY