NORTH HUGHENDEN SEWER SCHEME HUGHENDEN QUEENSLAND

5 RPEQ certified FRP Combo Packaged Pump Stations for the North Hughenden Sewer Scheme.

Mullaly was contracted to manufacture and deliver 5 FRP Wet Well / Valve Pit Comb stations for the North Hughenden Sewer Scheme:
• Two 1.5m x 5.75m deep with 50mm Homa pump and 150mm inlet
• One 1.5m x 6.37m deep with 50mm Homa pump and 150mm inlet
• One 1.5m x 6.38m deep with 50mm Homa pump and 150mm inlet
• One 1.5m x 4.5m deep with 50mm Homa pump and 150mm inlet

GALLERY