How a one-piece fibreglass (FRP) pump station compares with a precast or poured concrete station, and how to choose between them.
A sewage or stormwater pump station is built in one of three ways:
Each can meet a design. The differences are in how long installation takes, how the structure handles sewer gases, how watertight it stays, and how much work has to be done inside a confined space. Mullaly has made one-piece fibreglass pump stations for over 30 years, and the comparison below is drawn from our published product information and project records.
| Feature | Mullaly fibreglass pump station | Concrete pump station |
|---|---|---|
| Package | Delivered as one complete unit, often a combo with an integral valve pit. No assembly on site | Comes in sections joined on site, or is poured on site. Fit-out needs access to a confined space |
| OH&S | No fit-out on site, so little need to enter the station as a confined space | Long assembly and heavy handling. Fit-out often in confined spaces |
| Time | Can be installed in a few hours on some projects, which cuts the chance of wet weather affecting the job | Longer assembly. An in situ concrete station typically takes weeks to install, for example over six weeks on Sino Iron and Badu Island |
| Weight | Light weight reduces OH&S risk and makes installation easier | Heavy handling increases OH&S risk and makes installation harder |
| Corrosion | Vinyl ester resin resists the corrosive chemicals in sewage. No coating or liner | Steel in concrete corrodes from H2S gas and the sulphuric acid it produces. Needs an internal coating or liner |
| Ground movement | Engineered to allow for ground movement with no structural fatigue | Ground movement can crack the concrete and break seals between sections |
| Life expectancy | 100-year design life | Can be designed for 100 years, but often needs repair or refurbishment after early corrosion or erosion |
| Warranty | 30-year limited product warranty | Varies |
| Maintenance | Smooth internal walls stay cleaner for longer | Rough walls need more frequent cleaning (without an internal liner) |
| Watertight | One sealed, single-unit construction that does not rely on sealants applied on site | Can leak through cracks, joins between sections or poorly placed concrete |
| Remote locations | Installed in some of the most remote places in Australia | Remote sites often have no concrete supply, and moving heavy units long distances is difficult and costly |
| Quality control | Made in controlled factory conditions to a design by a registered practising composite engineer | Quality of concrete placement varies with the experience of the crew |
In a sewer, bacteria produce hydrogen sulphide (H2S) gas. Above the waterline it forms sulphuric acid, which attacks concrete and corrodes the reinforcing steel inside it. A concrete wet well therefore needs an internal coating or liner, and that coating has to be inspected and maintained.
Mullaly pump stations are made with vinyl ester resin, which resists the corrosive chemicals in sewage, so no coating or liner is needed. At Ramingining in the Northern Territory, a Mullaly pump station inspected more than 20 years after installation had smooth, clean surfaces and stainless steel fittings in near perfect condition. Read the Ramingining project.

The purchase price of the structure is only part of the cost. Excavation time, dewatering, crane hire, shoring, confined space work and weather delays add up, and they grow the longer the hole is open.

Concrete remains the usual choice for stations bigger than a factory-made unit can be, and where the asset owner specifies it. The Mullaly WSAA appraisal covers external diameters from 1.2m to 4m and depths to 14m, and larger units are engineered to project, so for very large stations check with us early. For most network, subdivision and commercial sewage pump stations within that range, a one-piece fibreglass station is worth pricing alongside concrete on the whole installed cost.
A Mullaly pump station is designed by a registered practising composite engineer for the internal and external loads on its site, including ground, groundwater and surface loads. Any load on the roof is taken by a reinforced concrete slab spanning the station.
An empty wet well in groundwater is buoyant whatever it is made of. Mullaly supplies ballast calculations to counter hydrostatic uplift with the installation instructions.
A concrete pump station made in sections off site, then joined and sealed in the excavation and fitted out on site.
Mullaly pump stations have a 100-year design life and a 30-year limited product warranty. There have been hundreds of installations and no known structural failures in over 30 years.
More on the material on our why fibreglass page. For the design side, see our pump station design guide. For products, see sewage pump stations, wet wells and valve pits.
Two fitted-out combo pump stations for a mine accommodation village. Installation took under a week.
2019 · Sydney Airport, NSWA 3.0m dia x 5.0m deep combo on reclaimed land, levelled and ready for backfill in under an hour.
1999 · Ramingining, NTA pump station for a remote Arnhem Land community, still in near perfect condition 20 years later.
2007 · Townsville, QLDA 4.0m dia x 8.5m deep wet well and a separate valve pit in sandy ground next to a creek.
Enter your email and the brochure opens straight away. We will also email you the link.
Send us your specification or drawings and we will quote a Mullaly FRP pump station for comparison. We reply to every enquiry within 2 business days.
Or call 02 4964 8270 or email sales@mullaly.com.au