Skip to content

Challenge

With an Airbus A380 parked on top of it, the pump station and storage had to handle tough conditions. Installation time and construction traffic on the airport had to be kept to a minimum.

What we supplied

One FRP combo packaged pump station combining the wet well, macerator and valve pit in one unit, and two 85kL overflow storage tanks.

Result

Delivery took only three semi-trailers. The units were lifted into place once excavation was done, then ballasted and backfilled. The result is durable and low maintenance.

Request a quote

Tell us about the site and what you need. We reply within 2 business days.

Or call 02 4964 8270 or email sales@mullaly.com.au

Newsletter